Newsroom

Greenberry Industrial to Support Westinghouse on Poland’s First Nuclear Power Plant

Greenberry / News ReleaseRelease date: November 20, 2026

Specialized U.S. industrial fabrication expertise to contribute to the landmark AP1000® nuclear energy project

Greenberry industrial fabrication of a large steel wall module in the Vancouver, Washington shop
Greenberry industrial fabrication work.

VANCOUVER, Wash., Nov. 20, 2026 – Greenberry Industrial, a provider of specialized industrial fabrication and construction services, is preparing to support Westinghouse Electric Company’s work on Poland’s first nuclear power plant, being developed by Polskie Elektrownie Jądrowe, the state-owned project investor (PEJ).

The Lubiatowo-Kopalino project in northern Poland is planned to include three Westinghouse AP1000® reactors. Greenberry’s anticipated work will draw on the company’s experience producing complex fabricated components for highly regulated industrial environments.

Greenberry’s scope includes fabrication of CA20 Wall modules once the current long-lead item (LLI) procurement contract is successfully completed.

“We are proud to have the opportunity to contribute to a project of this significance,” said Kenneth Harris, Program Sponsor-Nuclear. “Our team understands the precision, quality, and accountability required in nuclear construction. Supporting Westinghouse, Polskie Elektrownie Jądrowe and Poland’s nuclear energy program is an important opportunity to demonstrate the capabilities of American manufacturing and the skilled craftspeople behind our work.”

Supporting Poland’s Nuclear Energy Development

PEJ and Westinghouse have advanced procurement planning for the project, including long-lead equipment needed for the first AP1000® unit. The project is intended to strengthen Poland’s long-term energy security and expand reliable, low-emission electricity generation.

Experience in Complex Nuclear Fabrication

Greenberry’s capabilities include custom-engineered equipment, structural steel, piping systems and modular assemblies. The company maintains an NQA-1 quality assurance program and has supported complex nuclear-related fabrication, including equipment supplied for the Hanford Waste Treatment and Immobilization Plant in Washington state.

“Projects like this demonstrate the importance of combining technical expertise with disciplined execution,” said Brent Delahunt, VP of Fabrication. “We look forward to bringing that same commitment to quality, safety, and performance to the work ahead.”

Fabrication Photo Gallery

Additional views of Greenberry shop fabrication.

About Greenberry Industrial

Greenberry Industrial is an industrial contractor and fabricator serving the nuclear, energy, high-tech and manufacturing markets. Its teams deliver specialized fabrication, construction and maintenance services with a focus on safety, quality and disciplined execution. Learn more at www.greenberry.com.

Media Contact

Kenneth Harris | Program Sponsor-Nuclear | Greenberry
C: 503-939-9282 | D: 360-567-0006
www.greenberry.com

###

LinkedIn
Facebook
Twitter
Email