Facilities

Sulphur, LA

Facility Overview

  • 20,000 Sq. Feet of Covered Fabrication Space
  • Climate Controlled
  • Three 5-Ton Bridge Cranes
  • 8 Welding Stations
  • 18′ Under the Crane Hook
  • 8 Positioners
  • CNC Pipe Processing Equipment

Modular Capacity

  • 3.2 Acre Dedicated Material Laydown Area & Assembly Area
  • Additional 20 Acre Storage & Laydown
  • Prefabrication & Sub-assemblies for Jennings, LA, Shop
  • Storage Yard

Capabilities

  • Pipe Fabrication
  • Structural Steel Fabrication
  • Miscellaneous Metals Fabrication
  • Module Fabrication
  • Industrial Construction
  • Maintenance
  • Piping
  • Millwright
  • Civil
  • Concrete

Logistics

  • Located Within the Lake Charles Industrial Development Corridor
  • 1 Mile Away from Interstate 10
  • 14.8 Miles Away from Lake Charles Regional Airport