SAGD Well Pad Modules
Greenberry Industrial was selected by the owner to fabricate, assemble, test, inspect, and prepare for shipment the modules for Devon’s Jackfish 2015 Well Pad Program. Jackfish is Devon steam assisted gravity drainage (SAGD) plant located in Alberta’s vast boreal forest. Greenberry built 23 modules ranging in size from 10’x10’x40′ to 20’x20’x85′. The truckable Instrument and […]
Mt. Poso Plant Conversion
Greenberry was the general contractor for the installation of a Greenfield biomass unloading, storage (stacking), reclaiming, and feed system. The new system contained the following items: Unloading three receiving hoppers (two for live bottom trucks, one 75′ industrial truck dump) feeding five conveyors (1500′ total length). Stacker/Reclaimer capable of stacking 4 million cubic feet of […]
Dalles Dam Upstream Navigation Lock Gate
Greenberry Industrial was selected to provide gate fabrication and coatings for the new upstream navigation lock gate and associated major components for the The Dalles Dam. The new dam gate is approximately 92′ long and weighs 220,000 pounds and was fabricated in one piece at our Vancouver, Washington facility. Fabrication tolerances were very tight which […]
Modular MCC Building Fabrication & Assembly
Greenberry was contracted to supply a new MCC building for the replacement fish ladder pumps at the John Day Dam on the Columbia River. Greenberry utilized multiple fabrication facilities, and the final module was assembled at the Greenberry waterfront access facility. In addition to the module building fabrication, Greenberry also managed the installation of all […]