Projects

Slug Catcher Vessel

Owner

Confidential

Location

North Slope, AK

Industry

Oil Gas & Chemical

Services

Industrial Fabrication

Project Overview

Slug Catcher Vessel Fabrication for Upstream Oil Producer

Project Highlights

  • Fabrication of 345,000 lb. vessel that was 192′ in diameter and 90′ long
  • Fabrication of all piping
  • 265 psi design pressure
  • Fabrication schedule was 140 days; Greenberry completed the vessel in 120 days

Share This Project