Semiconductor Plant Central Utility Construction

Owner

TSMC

Location

Phoenix, AZ

Industry

High Tech

Services

Industrial FabricationIndustrial Construction

Project Overview

CUP Mechanical Fabrication and Installation

Project Highlights

  • 9,500 of pipe fabricated
  • 30,000 of pipe installed
  • Installation of 61 total pumps, heat exchangers, tanks, and boilers
  • Peak field workforce of 150
  • 14-month project duration