Power & Energy 2017-04-30T11:31:02+00:00
2017-04-30T11:31:05+00:00

SAGD Well Pad Modules

SAGD WELL PAD MODULES Greenberry Industrial was selected by the owner to fabricate, assemble, test, inspect, and prepare for shipment the modules for Devon’s Jackfish 2015 Well Pad Program. Jackfish is Devon’s steam‐assisted gravity drainage (SAGD) plant located in Alberta’s vast boreal forest. Greenberry built 23 modules ranging in size

2017-04-30T11:31:09+00:00

Nebraska Package Boiler Installation

NEBRASKA PACKAGE BOILER INSTALLATION Greenberry was selected as the design/build general contractor to install a new gas fired 10,000 lb/hr Nebraska package boiler, and Nash Vacuum/Hogging pump system. SERVICES PROVIDED Receive and install new Package Boiler, vacuum pumps, and associated equipment Fabricate and install new steam, condensate, make-up

2017-04-30T11:31:09+00:00

Cogen Shutdowns

COGEN SHUTDOWNS Greenberry’s long-standing relationship with Iberdrola includes shutdown expertise. SERVICES PROVIDED Provided project management and coordination HRSG modifications Removed and replaced multiple superheaters Removed and replaced 9 chrome control valves Installed heat exchanger system Provided Aux Boiler pipe modifications Post heating PROJECT STATISTICS Under budget

2017-04-30T11:31:10+00:00

Nuclear Shielded Container

,

NUCLEAR SHIELDED CONTAINER Greenberry was contracted to provide project management, engineering and expedited fabrication of one DOT 7A Type A Shielded Container for final delivery to Hanford Nuclear Reservation. SERVICES PROVIDED Worked together with customer to complete a design that meets radiation shielding requirements of the procurement specification. Supplied materials

2017-04-30T11:31:10+00:00

Emergency Generator Canopy Systems

,

EMERGENCY GENERATOR CANOPY SYSTEMS Design/Build new Emergency Generator Containment and canopy system to house the Emergency Generator for the Detroit and Big Cliff Dam facilities. SERVICES PROVIDED Provide and coordinate all design, engineering, excavation, crane, scaffolding, and inspection subcontractor’s Excavate for and place new concrete foundations and containment

2017-04-30T11:31:10+00:00

Navigation Lock Downstream Gate Replacment

,

NAVIGATION LOCK DOWNSTREAM GATE REPLACEMENT This project involved the critical shut down of the Columbia River water traffic to enable the replacement of the 50 year old John Day Dam navigation lock downstream gate. Greenberry’s scope of services including fitting and welding of the four new dam gate sections utilizing