Material Handling 2018-01-17T11:14:28+00:00
2017-04-30T11:31:09+00:00

Port of Everett Terminal Expansion

PORT OF EVERETT TERMINAL EXPANSION Complete refurbishment of the existing Port bulk facility to handle approximately 500,000 tons of cement per year. The new terminal will include a 350 foot diameter 60,000-ton storage dome, docking facilities, conveying equipment, and loading bays for both truck and rail service. SERVICES PROVIDED

2017-04-30T11:31:10+00:00

Stacker / Reclaimer Installation

STACKER/RECLAIMER INSTALLATION Installation of a Greenfield chip unloading, storage (stacking), reclaiming, and feed system. Unloading – two 75′ Phelps Industries truck dump systems feeding three Dimisa conveyors (930′ total length). Stacker/Reclaimer – FMW 360 degree stacker/reclaimer capable of stacking 6 million cubic feet of wood chips. Feed System – one