Material Handling 2017-04-30T11:31:02+00:00
2017-04-30T11:31:09+00:00

Port of Everett Terminal Expansion

,

PORT OF EVERETT TERMINAL EXPANSION Complete refurbishment of the existing Port bulk facility to handle approximately 500,000 tons of cement per year. The new terminal will include a 350 foot diameter 60,000-ton storage dome, docking facilities, conveying equipment, and loading bays for both truck and rail service. SERVICES PROVIDED

2017-04-30T11:31:10+00:00

Stacker / Reclaimer Installation

,

STACKER/RECLAIMER INSTALLATION Installation of a Greenfield chip unloading, storage (stacking), reclaiming, and feed system. Unloading – two 75′ Phelps Industries truck dump systems feeding three Dimisa conveyors (930′ total length). Stacker/Reclaimer – FMW 360 degree stacker/reclaimer capable of stacking 6 million cubic feet of wood chips. Feed System – one