Ethane Cracker Plant Refurbishment and Restart

ETHANE CRACKER PLANT REFURBISHMENT & RESTART In 2015, Indorama Ventures purchased an ethane cracker plant that was shuttered in 2001. Indorama set about refurbishing the plant in order to begin operations by the end of 2017. Greenberry was originally contracted to provide field verification, field sketching, and pipe

2017-10-13T15:39:42+00:00

Paper Machine Improvement & Headbox Replacement

HEADBOX REPLACEMENT Greenberry was contracted by International Paper to replace and/or upgrade multiple approach piping and mechanical systems, a new primary and secondary headbox, and new slitting equipment on an existing, fully operating containerboard, paper machine. Greenberry was tasked to complete the pre-shutdown as well as the shutdown installation, commissioning

2017-04-30T11:31:05+00:00

CBI/WECTEC – Westinghouse AP1000 Floor Modules

CBI/WECTEC – Westinghouse AP1000 Floor Modules Greenberry Industrial has been selected by CBI/WECTEC to fabricate 72 floor section modules for four new Westinghouse AP1000 nuclear plants; the first nuclear plants built in the US in 35 years. These modular floor sections include various structural components for the plant and also

2017-04-30T11:31:05+00:00

Cosmo Specialty Fibers – Maintenance Services

COSMO SPECIALTY FIBERS MAINTENANCE Greenberry Industrial is proud to have worked for over five years and over 500,000 hours with zero recordable injuries at Cosmo Specialty Fibers in Cosmopolis, Washington. Greenberry was contracted by Cosmo Specialty Fibers in 2011 when the paper mill was recommissioned to provide maintenance services. Greenberry

2017-10-18T16:16:49+00:00

The Dalles Dam – Upstream Navigation Lock Gate

DALLES DAM UPSTREAM NAVIGATION LOCK GATE Greenberry Industrial was selected to provide gate fabrication and coatings for the new upstream navigation lock gate and associated major components for the The Dalles Dam. The new dam gate is approximately 92’ long and weighs 220,000 pounds and was fabricated in one piece

2017-04-30T11:31:05+00:00

Nabors Drilling – CDR3 Coil Horizontal Drill Rig

CDR3 COIL HORIZONTAL DRILL RIG Greenberry was contracted by Nabors Drilling in 2015 to provide fabrication, assembly, piping, electrical and instrumentation and equipment installation on the CDR3 Coil Horizontal Drill Rig. Greenberry served in the role of construction integrator for the fabrication, assembly, and equipment installers for this one year

2017-04-30T11:31:05+00:00

Bechtel Stainless Steel, Complex Vessel

BECHTEL STAINLESS STEEL, COMPLEX VESSEL Bechtel’s Nuclear, Security and Environmental global business operating unit contracted Greenberry to build a 16 foot diameter by 38 foot tall stainless steel, complex test vessel in the Vancouver fabrication shop. Fabrication consisted of three shell courses of 3/4” thick 316L stainless steel with a

2017-04-30T11:31:05+00:00

SAGD Well Pad Modules

SAGD WELL PAD MODULES Greenberry Industrial was selected by the owner to fabricate, assemble, test, inspect, and prepare for shipment the modules for Devon’s Jackfish 2015 Well Pad Program. Jackfish is Devon’s steam‐assisted gravity drainage (SAGD) plant located in Alberta’s vast boreal forest. Greenberry built 23 modules ranging in size

2017-04-30T11:31:05+00:00

Bio-Fuels and Ethanol Terminal Upgrade

,

BIO-FUELS AND ETHANOL TERMINAL UPGRADE Greenberry was selected by the owner as general contractor to modify their Seattle/Harbor Island Terminal facility at the Port of Seattle so they could receive and distribute both ethanol and bio-fuels to the Seattle Metropolitan area.  This was a fast tract project that involved an

2017-10-18T16:04:27+00:00

Arctic Containment System

,

ARCTIC CONTAINMENT SYSTEM Greenberry Industrial was contracted by the project owner to provide fabrication and construction services for work associated with its Arctic Containment System (ACS) Project. The ACS is a first-of-its-kind prototype spill containment system designed to support offshore oil exploration activities in Arctic waters. Under fast-track conditions from

2017-04-30T11:31:05+00:00

Tank Farm Expansion

TANK FARM EXPANSION This project was the second expansion and existing soy sauce production and distribution facility. The total increase in the tank farm size was over 7,000 sf. Greenberry was the general contractor on the first expansion in 2002, and was selected again in 2007 by the owner for the phase