DALLES DAM UPSTREAM NAVIGATION LOCK GATE

Greenberry Industrial was selected to provide gate fabrication and coatings for the new upstream navigation lock gate and associated major components for the The Dalles Dam. The new dam gate is approximately 92’ long and weighs 220,000 pounds and was fabricated in one piece at our Vancouver, Washington facility. Fabrication tolerances were very tight which was achieved by the use of 3D measuring equipment owned by Greenberry. Heavy component fabrication required thermal stress relief and AWS D1.5 Fracture Critical welding.

This project was executed by working multiple shifts in a compressed schedule in order to meet a ship date dictated by scheduled outages at Bonneville Dam. Bonneville Dam is located between our dock on the Columbia River in Vancouver, Washington where the gate was shipped from and the The Dalles Dam jobsite.

FLY-OVER VIDEO: The Dalles Dam Navigation Gate In Use

Video courtesy of Olsson Industrial Electric (https://olssonelec.com/)
Drone Video courtesy of FPW Media (http://fpwmedia.com/)

PHOTOS

Greenberry the Dam Dalles Gate

Upstream Navigation Lock Gate Greenberry

Steel Welding Dam Gate Greenberry

Steel Fabrication Dam Gate Greenberry

Photos credit: Grant Mott Photography

AWARDS

ENR 2017 Regional Best Projects Award

PROJECT STATISTICS

  • Quantities: 92’ Tainter Navigation Gate
  • Total Weight: 130 tons (including other major components)
  • On schedule: A compressed project timeline allowed for on-time delivery.
  • No safety incidents