Port of Everett Terminal Expansion2018-08-14T11:59:07+00:00

Project Description

PORT OF EVERETT TERMINAL EXPANSION

Complete refurbishment of the existing Port bulk facility to handle approximately 500,000 tons of cement per year. The new terminal will include a 350 foot diameter 60,000-ton storage dome, docking facilities, conveying equipment, and loading bays for both truck and rail service.

SERVICES PROVIDED

  • 10,000 yds of structural concrete formed and poured.
  • 700 lf- 35 ft tall X 24 inch thick circular wall formed and poured
  • 1.2 million lbs of rebar installed
  • 400 lf of airslides fabricated and installed
  • Two 600 ton cement silos fabricated and installed
  • Three new air compressors
  • Six new 600cfm air blowers
  • 10,000 lf of compressed air and process piping. Fabricated, and installed
  • 300 tons of heavy structural Iron fabricated and erected
  • Electrical- installed 4 separate Plc systems, 150 KV transformer and all associated equipment
  • Six saferack access systems
  • Rebuilt 1,500 lf of conveyors, belts, structures steel, drives, skirts boards, and wind covers
  • Installed a 220 diameter dome fluid bed system.
  • Two truck automated ticketed load out facility
  • Railcar load out system
  • On site engineering support
  • Commissioning and start-up support

AWARDS

  • NW Construction Consumer Council – 2007 Distinguished Project Award

PROJECT STATISTICS

  • On schedule and budget
  • Worked 175,000+ safe hours