Greenberry performed an award-winning gate fabrication and coatings for the new upstream navigation lock gate (measuring 92’ long) and associated major components of The Dalles Dam in The Dalles, Oregon.
Nabors Drilling – CDR3 Coil Horizontal Drill Rig
Module, Oil & Gas
Meghan Murphy2019-07-08T11:26:10-07:00Greenberry provided fabrication, assembly, piping, electrical, instrumentation, and equipment installation services on the CDR3 Coil Horizontal Drill Rig for Nabors Drilling to be utilized by Conoco Phillips in Alaska.
Bechtel Stainless Steel, Complex Vessel
Nuclear Services
Meghan Murphy2019-07-08T11:39:39-07:00Greenberry built a 16’ x 38’ stainless steel complex test vessel in conjunction with Bechtel Corporation’s Nuclear, Security, and Environmental global business operating unit for the Hanford VIT Plant in Richland, Washington.
SAGD Well Pad Modules
Module, Power / Energy
superbee2019-07-08T11:46:39-07:00Greenberry performed fabrication, assembly, testing, and inspection services of 23 modules for Devon Energy’s steam-assisted gravity drainage (SAGD) plant, Jackfish 2015 Well Pad, located in Alberta’s vast boreal forest.
New Distribution Facility
Oil & Gas, Refineries & Terminals
superbee2019-07-08T11:26:30-07:00Greenberry provided construction management and execution for all tank demolition, civil and concrete work, fabrication of structural steel and pipe spools, and installation of all piping, pumps, and instruments for a new distribution facility in Portland, Oregon.
Bio-Fuels and Ethanol Terminal Upgrade
Oil & Gas, Refineries & Terminals
superbee2019-07-08T11:27:14-07:00Greenberry performed civil and concrete placement, expansion of the rail car unloading area, fabrication and installation of piping, and surface prep and painting services for the Seattle/Harbor Island Terminal facility at the Port of Seattle.
Arctic Containment System
Marine / Hydro, Module, Oil & Gas
superbee2019-07-08T11:26:43-07:00Greenberry provided bulk materials procurement, structural steel and pipe spool fabrication, field assembly, and marine installation of the modules onto the Arctic Challenger barge moored at the Port of Bellingham Shipping Terminal in Washington.
Tank Farm Expansion
Food Processing
superbee2019-07-08T11:45:00-07:00Greenberry performed concrete, piping, electrical, instrumentation, testing, and commissioning services as well as fabrication and installation of all structural steel, food grade piping, and utility piping for a new Yamasa Soy Sauce facility in Salem, Oregon.
New Congealer
Chemical, High Technology
superbee2019-07-08T11:30:54-07:00Greenberry coordinated and performed a variety of manufacturing infrastructure upgrades for Xerox in Wilsonville, Oregon, including an auger and pneumatic conveyor system, orbital tubing, wiring and controls instrumentation, supports, and piping.
Melter Installation
High Technology
superbee2019-07-08T11:43:44-07:00Greenberry managed and performed the installation of process equipment—along with subcontractor management, facilitation of short evening and weekend outages, and extensive hot oil system work—for a Xerox plant in Wilsonville, Oregon.