Project Description
NUCLEAR SHIELDED CONTAINER
Greenberry was contracted to provide project management, engineering and expedited fabrication of one DOT 7A Type A Shielded Container for final delivery to Hanford Nuclear Reservation.
SERVICES PROVIDED
- Worked together with customer to complete a design that meets radiation shielding requirements of the procurement specification.
- Supplied materials and labor to fabricate a container that meets the criteria of Design Specification.
- Tested the container as required by DOT Specification 7A (drop test, puncture test, stack test, water leak test)
- Preassembled at shop with required witnesses to assure container lid can be installed remotely.
- Furnished 10 mil nylon reinforced polyethylene confinement liner.
- Provided NDE testing as required to detect radioactive shine in the shielding.
- Ship container to designated point near Hanford Waste Site via two separate loads.
PROJECT STATISTICS
- On time and on budget