NOx Emission Reduction2019-07-08T11:28:12-07:00

Project Description

NOX EMISSION REDUCTION

This petroleum refinery piping system upgrade was commissioned directly by the owner. Greenberry provided fabrication, installation and construction coordination services as well as multiple piping tie-ins inside the operating refinery.

SERVICES PROVIDED

  • Project included layout, excavation, installation of concrete foundation and apron
  • Performed hot tap and tie ins into existing piping system
  • Fabrication and installation of stainless steel and carbon steel pipe spools into existing pipe rack
  • Fabrication and installation of utility piping systems
  • Tie into existing OWS sewer systems
  • Painting and installation of insulation and steam tracing
  • Installation of 16,000 pound ESNCR skid

PROJECT STATISTICS

  • On time and on budget