Project Description
ETHANE CRACKER PLANT REFURBISHMENT & RESTART
In 2015, Indorama Ventures purchased an ethane cracker plant that was shuttered in 2001. Indorama set about refurbishing the plant in order to begin operations by the end of 2017. Greenberry was originally contracted to provide field verification, field sketching, and pipe spool fabrication for large bore piping. Due to Greenberry’s efficient performance and stellar safety record, the project scope grew to employ over 300 craft workers.
SERVICES PROVIDED
- Over 52,000 diameter inches of weld for pipe fabrication in Greenberry’s local fabrication facility
- Over 45,000 diameter inches of weld for field pipe installation
- Coded vessel repair for over 23 drums and towers
- Fabricate and install aluminum piping for the cold box
- Additional work activities: civil foundations, fabricate and install structural pipe supports, erect new structural steel structures and platforms
PROJECT STATISTICS
- 350,000 safe work hours without a lost time accident
- Average daily roster of 255 craft workers