Project Description
BUTANE RAILCAR UNLOADING
This project encompassed fabrication and installation of seven (7) piping systems as well as all pipeway tie-ins related to Railcar Unloading.
SERVICES PROVIDED
- The process system modifications included: Butane, Nitrogen, Olefin- (2), Propane, Compressor and Vaporizer piping and supports.
- All were fabricated in Greenberry’s northern Washington fabrication facility and installed on site.
- Greenberry coordinated with operations on multiple shutdowns for loading arm piping tie-ins in the rail car area.