Greenberry performed constructibility and configuration control, nuclear procurement, and fabrication services of 72 floor section modules for four new Westinghouse AP1000 nuclear plants for CBI/WECTEC.
Cosmo Specialty Fibers – Maintenance Services
Pulp & Paper
FPW Media2019-07-08T10:56:20-07:00Greenberry performed maintenance services (including equipment, carpentry, pipefitting, welding, and planning), potential hazard identification, and safety improvements for a recommissioned paper mill owned by Cosmo Specialty Fibers in Cosmopolis, Washington.
The Dalles Dam – Upstream Navigation Lock Gate
Hydro, Marine / Hydro
FPW Media2019-07-08T11:33:14-07:00Greenberry performed an award-winning gate fabrication and coatings for the new upstream navigation lock gate (measuring 92’ long) and associated major components of The Dalles Dam in The Dalles, Oregon.
Nabors Drilling – CDR3 Coil Horizontal Drill Rig
Module, Oil & Gas
Meghan Murphy2022-06-20T09:54:40-07:00Greenberry provided fabrication, assembly, piping, electrical, instrumentation, and equipment installation services on the CDR3 Coil Horizontal Drill Rig for Nabors Drilling to be utilized by Conoco Phillips in Alaska.
Bechtel Stainless Steel, Complex Vessel
Nuclear Services
Meghan Murphy2019-07-08T11:39:39-07:00Greenberry built a 16’ x 38’ stainless steel complex test vessel in conjunction with Bechtel Corporation’s Nuclear, Security, and Environmental global business operating unit for the Hanford VIT Plant in Richland, Washington.
SAGD Well Pad Modules
Module, Power / Energy
superbee2021-08-25T13:08:17-07:00Greenberry performed fabrication, assembly, testing, and inspection services of 23 modules for Devon Energy’s steam-assisted gravity drainage (SAGD) plant, Jackfish 2015 Well Pad, located in Alberta’s vast boreal forest.
Bio-Fuels and Ethanol Terminal Upgrade
Oil & Gas, Refineries & Terminals
superbee2019-07-08T11:27:14-07:00Greenberry performed civil and concrete placement, expansion of the rail car unloading area, fabrication and installation of piping, and surface prep and painting services for the Seattle/Harbor Island Terminal facility at the Port of Seattle.
Arctic Containment System
Marine / Hydro, Module, Oil & Gas
superbee2022-06-20T09:56:41-07:00Greenberry provided bulk materials procurement, structural steel and pipe spool fabrication, field assembly, and marine installation of the modules onto the Arctic Challenger barge moored at the Port of Bellingham Shipping Terminal in Washington.
Alaska Offshore Piling Template
Oil & Gas
superbee2019-07-08T11:26:57-07:00Greenberry fabricated materials for, provided full NDE for, provided codes and specifications for, and assembled a 200+ ton offshore platform piling template for Furie Energy at its Vancouver, Washington, facility.
Diesel Pour Point Installation
Refineries & Terminals
superbee2017-04-30T11:31:06-07:00DIESEL POUR POINT INSTALLATION This small cap project consisted of setting an additive tank and installing all peripheral process piping, valves, instrumentation and tie-ins. SERVICES PROVIDED Greenberry fabricated all the pump and steam piping in its northern Washington fab shop. Shipped all components to refinery for installation. Coordinated delivery