Heat Exchanger Fabrication

,

2019-05-07T16:35:46-07:00

Heat Exchanger Fabrication Contracted by Lundberg, Greenberry fabricated a large 56” OD HVLC Gas Cooler Heat Exchanger at our Vancouver, WA, facility. Greenberry performed the complete mechanical design for this exchanger and created, in-house, the required fabrication drawings and all manufacturing details. Greenberry also developed the assembly, testing

EMF Vessels

2019-04-02T11:55:11-07:00

EMF VESSELS Greenberry was contracted by Bechtel National Inc (BNI) to fabricate six large diameter alloy and stainless-steel corrosion-resistant process vessels for Hanford’s Waste Treatment and Immobilization Plant (WTP), also know at the Vit Plant. The vessels will help process liquids throughout the effluent management facility. Design, fabrication,

CBI/WECTEC – Westinghouse AP1000 Floor Modules

,

2018-12-05T09:14:39-07:00

CBI/WECTEC – Westinghouse AP1000 Floor Modules Greenberry Industrial has been selected by CBI/WECTEC to fabricate 72 floor section modules for four new Westinghouse AP1000 nuclear plants; the first nuclear plants built in the US in 35 years. These modular floor sections include various structural components for the plant and also

The Dalles Dam – Upstream Navigation Lock Gate

,

2018-10-17T12:10:02-07:00

DALLES DAM UPSTREAM NAVIGATION LOCK GATE Greenberry Industrial was selected to provide gate fabrication and coatings for the new upstream navigation lock gate and associated major components for the The Dalles Dam. The new dam gate is approximately 92’ long and weighs 220,000 pounds and was fabricated in one piece

Nabors Drilling – CDR3 Coil Horizontal Drill Rig

,

2019-05-24T12:59:56-07:00

CDR3 COIL HORIZONTAL DRILL RIG Greenberry was contracted by Nabors Drilling in 2015 to provide fabrication, assembly, piping, electrical and instrumentation and equipment installation on the CDR3 Coil Horizontal Drill Rig. Greenberry served in the role of construction integrator for the fabrication, assembly, and equipment installers for this one year

Bechtel Stainless Steel, Complex Vessel

2018-08-14T12:47:13-07:00

BECHTEL STAINLESS STEEL, COMPLEX VESSEL Bechtel’s Nuclear, Security and Environmental global business operating unit contracted Greenberry to build a 16 foot diameter by 38 foot tall stainless steel, complex test vessel in the Vancouver fabrication shop. Fabrication consisted of three shell courses of 3/4” thick 316L stainless steel with a

SAGD Well Pad Modules

,

2018-12-05T13:31:40-07:00

SAGD WELL PAD MODULES Greenberry Industrial was selected by the owner to fabricate, assemble, test, inspect, and prepare for shipment the modules for Devon’s Jackfish 2015 Well Pad Program. Jackfish is Devon’s steam‐assisted gravity drainage (SAGD) plant located in Alberta’s vast boreal forest. Greenberry built 23 modules ranging in size

Alaska Offshore Piling Template

2018-08-14T11:55:14-07:00

ALASKA OFFSHORE PILING TEMPLATE Greenberry Industrial was selected to assemble the 200+ ton offshore platform piling template at its Vancouver, WA, facility. Our steel erection and modularization experience, large-capacity assembly bays and laydown yard, and access to barge loading for ocean transport to Alaska provided the owner with an ideal combination for