Paper Machine Improvement & Headbox Replacement

2018-08-21T10:41:49-07:00

HEADBOX REPLACEMENT Greenberry was contracted by International Paper to replace and/or upgrade multiple approach piping and mechanical systems, a new primary and secondary headbox, and new slitting equipment on an existing, fully operating containerboard, paper machine. Greenberry was tasked to complete the pre-shutdown as well as the shutdown installation,

CBI/WECTEC – Westinghouse AP1000 Floor Modules

,

2018-12-05T09:14:39-07:00

CBI/WECTEC – Westinghouse AP1000 Floor Modules Greenberry Industrial has been selected by CBI/WECTEC to fabricate 72 floor section modules for four new Westinghouse AP1000 nuclear plants; the first nuclear plants built in the US in 35 years. These modular floor sections include various structural components for the plant and also

The Dalles Dam – Upstream Navigation Lock Gate

,

2018-10-17T12:10:02-07:00

DALLES DAM UPSTREAM NAVIGATION LOCK GATE Greenberry Industrial was selected to provide gate fabrication and coatings for the new upstream navigation lock gate and associated major components for the The Dalles Dam. The new dam gate is approximately 92’ long and weighs 220,000 pounds and was fabricated in one piece

Nabors Drilling – CDR3 Coil Horizontal Drill Rig

,

2018-12-05T09:14:44-07:00

CDR3 COIL HORIZONTAL DRILL RIG Greenberry was contracted by Nabors Drilling in 2015 to provide fabrication, assembly, piping, electrical and instrumentation and equipment installation on the CDR3 Coil Horizontal Drill Rig. Greenberry served in the role of construction integrator for the fabrication, assembly, and equipment installers for this one year

Bechtel Stainless Steel, Complex Vessel

2018-08-14T12:47:13-07:00

BECHTEL STAINLESS STEEL, COMPLEX VESSEL Bechtel’s Nuclear, Security and Environmental global business operating unit contracted Greenberry to build a 16 foot diameter by 38 foot tall stainless steel, complex test vessel in the Vancouver fabrication shop. Fabrication consisted of three shell courses of 3/4” thick 316L stainless steel with a

Tank Farm Expansion

2017-04-30T11:31:05-07:00

TANK FARM EXPANSION This project was the second expansion and existing soy sauce production and distribution facility. The total increase in the tank farm size was over 7,000 sf. Greenberry was the general contractor on the first expansion in 2002, and was selected again in 2007 by the owner for the phase

New Congealer

,

2018-08-14T12:23:49-07:00

NEW CONGEALER Xerox has multiple manufacturing infrastructure upgrades that require the kind of expertise that Greenberry offers on a consistent basis. SERVICES PROVIDED Provided project management and coordination Installed augers and pneumatic conveyor system Fabricated and installed orbital tubing Piped up victaulic and copper-chilled water to augers Managed

Melter Installation

2018-08-14T12:25:00-07:00

MELTER INSTALLATION Xerox relied on Greeberry’s ability to install process equipment while their plant remained in full operation. SERVICES PROVIDED Provided project management and coordination Installed augers and pneumatic conveyor system Managed four subcontractors Fabricated and installed stainless steel jacketed piping Set two melter tanks on load cells Set