Greenberry executed the replacement of 13 DC paper machine motor drives, optical alignment of 30 motors, replacement and installation of vacuum pumps, piping relocations, welding repairs, and plate installation for Temple Inland Paper in Ontario, California.
Mt. Poso Plant Conversion
Power / Energy
superbee2019-07-08T13:57:37-07:00Greenberry was hired as the general contractor to manage and implement the installation of a Greenfield biomass unloading, storage, reclaiming, and feed system for Mt. Poso Cogeneration in Bakersfield, California.
Walking Beam Reheat Furnace
Manufacturing
superbee2019-07-08T11:42:49-07:00Greenberry assembled and installed a 3,000,000-lb walking beam gas-fired reheat furnace with a capacity of reheating 800 tons of steel at 2,400º F per hour for California Steel Industries in Fontana, California.