Greenberry provided bulk materials procurement, structural steel and pipe spool fabrication, field assembly, and marine installation of the modules onto the Arctic Challenger barge moored at the Port of Bellingham Shipping Terminal in Washington.
Greenberry provided bulk materials procurement, structural steel and pipe spool fabrication, field assembly, and marine installation of the modules onto the Arctic Challenger barge moored at the Port of Bellingham Shipping Terminal in Washington.