Ethane Cracker Plant Refurbishment and Restart

2019-04-11T13:55:35-07:00

ETHANE CRACKER PLANT REFURBISHMENT & RESTART In 2015, Indorama Ventures purchased an ethane cracker plant that was shuttered in 2001. Indorama set about refurbishing the plant in order to begin operations by the end of 2017. Greenberry was originally contracted to provide field verification, field sketching, and pipe

Bio-Fuels and Ethanol Terminal Upgrade

,

2017-04-30T11:31:05-07:00

BIO-FUELS AND ETHANOL TERMINAL UPGRADE Greenberry was selected by the owner as general contractor to modify their Seattle/Harbor Island Terminal facility at the Port of Seattle so they could receive and distribute both ethanol and bio-fuels to the Seattle Metropolitan area.  This was a fast tract project that involved an

Arctic Containment System

, ,

2018-10-16T14:58:53-07:00

ARCTIC CONTAINMENT SYSTEM Greenberry Industrial was contracted by the project owner to provide fabrication and construction services for work associated with its Arctic Containment System (ACS) Project. The ACS is a first-of-its-kind prototype spill containment system designed to support offshore oil exploration activities in Arctic waters. Under fast-track conditions from

Tank Farm Expansion

2017-04-30T11:31:05-07:00

TANK FARM EXPANSION This project was the second expansion and existing soy sauce production and distribution facility. The total increase in the tank farm size was over 7,000 sf. Greenberry was the general contractor on the first expansion in 2002, and was selected again in 2007 by the owner for the phase

New Congealer

,

2018-08-14T12:23:49-07:00

NEW CONGEALER Xerox has multiple manufacturing infrastructure upgrades that require the kind of expertise that Greenberry offers on a consistent basis. SERVICES PROVIDED Provided project management and coordination Installed augers and pneumatic conveyor system Fabricated and installed orbital tubing Piped up victaulic and copper-chilled water to augers Managed

Melter Installation

2018-08-14T12:25:00-07:00

MELTER INSTALLATION Xerox relied on Greeberry’s ability to install process equipment while their plant remained in full operation. SERVICES PROVIDED Provided project management and coordination Installed augers and pneumatic conveyor system Managed four subcontractors Fabricated and installed stainless steel jacketed piping Set two melter tanks on load cells Set

Alaska Offshore Piling Template

2018-08-14T11:55:14-07:00

ALASKA OFFSHORE PILING TEMPLATE Greenberry Industrial was selected to assemble the 200+ ton offshore platform piling template at its Vancouver, WA, facility. Our steel erection and modularization experience, large-capacity assembly bays and laydown yard, and access to barge loading for ocean transport to Alaska provided the owner with an ideal combination for