CBI/WECTEC – Westinghouse AP1000 Floor Modules

,

2018-12-05T09:14:39+00:00

CBI/WECTEC – Westinghouse AP1000 Floor Modules Greenberry Industrial has been selected by CBI/WECTEC to fabricate 72 floor section modules for four new Westinghouse AP1000 nuclear plants; the first nuclear plants built in the US in 35 years. These modular floor sections include various structural components for the plant and also

Nabors Drilling – CDR3 Coil Horizontal Drill Rig

,

2018-12-05T09:14:44+00:00

CDR3 COIL HORIZONTAL DRILL RIG Greenberry was contracted by Nabors Drilling in 2015 to provide fabrication, assembly, piping, electrical and instrumentation and equipment installation on the CDR3 Coil Horizontal Drill Rig. Greenberry served in the role of construction integrator for the fabrication, assembly, and equipment installers for this one year

SAGD Well Pad Modules

,

2018-12-05T13:31:40+00:00

SAGD WELL PAD MODULES Greenberry Industrial was selected by the owner to fabricate, assemble, test, inspect, and prepare for shipment the modules for Devon’s Jackfish 2015 Well Pad Program. Jackfish is Devon’s steam‐assisted gravity drainage (SAGD) plant located in Alberta’s vast boreal forest. Greenberry built 23 modules ranging in size

Arctic Containment System

, ,

2018-10-16T14:58:53+00:00

ARCTIC CONTAINMENT SYSTEM Greenberry Industrial was contracted by the project owner to provide fabrication and construction services for work associated with its Arctic Containment System (ACS) Project. The ACS is a first-of-its-kind prototype spill containment system designed to support offshore oil exploration activities in Arctic waters. Under fast-track conditions from

Modular MCC Building Fabrication & Assembly

, ,

2018-12-13T11:32:11+00:00

MODULAR MCC BUILDING FABRICATION & ASSEMBLY Greenberry was contracted to supply a new MCC building for the replacement fish ladder pumps at the John Day Dam on the Columbia River. Greenberry utilized multiple fabrication facilities, and the final module was assembled at the Greenberry waterfront access facility. In addition to

Pipe Rack Modules

,

2018-12-13T11:34:41+00:00

INDUSTRIAL PIPE RACK MODULES The customer contracted Greenberry Industrial to fabricate and assemble two 10’ x 12’ x 24’ truckable pipe rack modules to be used in the customer’s nitrogen plant operations in Dawson Creek, British Columbia. Greenberry was responsible for the engineering, design, and testing of these modules, as