Greenberry performed an award-winning gate fabrication and coatings for the new upstream navigation lock gate (measuring 92’ long) and associated major components of The Dalles Dam in The Dalles, Oregon.
Port of Everett Terminal Expansion
Hydro, Marine / Hydro, Material Handling
superbee2019-07-08T11:33:30-07:00Greenberry, in conjunction with Lehigh Northwest Cement Co., refurbished the Port of Everett bulk facility in Everett, Washington. This included concrete work, piping, structural construction, electrical, and commissioning.